ProsperityProjects

  • Increase font size
  • Default font size
  • Decrease font size
Home Energy Alternative biodiesel

Project Directory

biodiesel

Contact Name
George Hardin
Organization
H&H Alternate energy Inc
Address
16305 Congo Lane
City
Houston
State (US Only)
Texas
Postal Code
77040
Country
United States
Telephone
832 478 5289
Fax
892 478 5289
E-mail
Project Status
Plans Completed
Full Description (Required)
1 PROJECT OVERVIEW: This project is to make the World a Cleaner Place to Live by making up to 100,000,00,000,000 gallons of biodiesel at two locations costing $110,000 each or $220,000. Biodiesel will be distributed through 100 biodiesel truck stops called Big H Mega Can & Truck Plazas. They will create 180 jobs each or 22,500 jobs total. There will be 2,100,000,000 metric tons of raw oil in a 20 day cycle, delivered by tankers to refineries in the Houston, Tx, and Corpus Christi Tx. areas. The Humanitarian impact will be loss of the many stresses that face our planet due to reliance on petroleum based fuel. The biodiesel will be distributed through 100 Big H Mega Car & Truck Plazas. This system will not only create 22,500 jobs but it will make the air in the US easier to breath while helping with Global warming. We will have everything the trucker needs to stay on the road delivering their cargo where it has to go. We will have cab air systems enabling the truckers to stay in their trucks to sleep without running their engines creating air pollution and wasting precious diesel fuel to boot. In doing all this we will create good paying jobs from, coast to coast along interstate 40 as far as you can in the USA. H&H is helping to make the employment problem in this country less of a problem. We plan on having all our employees having good medical benefits along with their good pay. Coupling the biodiesel, truck stops and the truckers. 2 THE PROBLEM This problem developed because of the inaction of the people in the US Congress and Senate along with the 'don’t care' of the oil companies about having to import fossil fuel from other countries, keeping their bottom lines up so the top CEO’S could get bigger pay checks. No one wants to be on the leading edge of solving this problem. Everyone wants to blame each other for the short fall thus keeping the same problem on-going. While there have been some government programs to help solve this problem we keep keeping the same people in Washington that have no idea of how to do anything except blow money while making the problem get bigger each year. The proposed approach is to not only make biodiesel but to sell the fuel to the people that need it to deliver the goods America needs to keep afloat. This, along with building 2 biodiesel factories. One will be in Corpus Christi Tx. And the other one will be in Houston, Tx. Others only want to make small amounts of biodiesel selling it wherever and as much goes over seas as stays in the US. Another thing that a lot of others have done is to get a biodiesel plant that would only produce biodiesel from one source of feed stock. Ours will use any feed stock on the market making it possible for us to keep producing biodiesel while other plants are sitting idle because they can’t get feed stock they need to run in their plants. Second, we plan on selling our biodiesel to the truckers that use the product here in the US making a two or three fold difference, helping solve the energy problem, creating good jobs coast to coast, and helping solve the Global warming problem all at the same time. The implementation of this project will help solve the employment problem. The expected measurable results are jobs, energy and clean air for everyone to breathe. The number of people affected by this project is expected to be around 22,500 from coast to coast. This will feed at least 66,000 people as well as helping the truckers feed their families. Estimates of intangible economic, social, and other benefits will be in the billions of dollars to the US economy as well as many dollars in taxes helping off set the growing deficit. 3. Funds Sought Our estimates are we will need $14,000,000,000 (Fourteen Billion Dollars) to complete all 100 trucks. That will be everything from the land, construction, all fixtures stock to get opened and operating cost for a year if needed. H&H Alternate Energy Inc George Hardin 16305 Congo Lane Houston Texas 77040 832 478 5289/ fax 832 478 5289
Funding Purpose
to build and run the whole project
Specific Assistance Needed
  • Carpenter
  • Accountant
  • Project Mgr
  • Engineer
  • Construction
  • Architect
  • Cook/Chef
  • Other (Please Specify Below)
Specific Assistance (other)
all fields needed to run a business

Project Directory